Earthworks + material delivery
Earthworks for a highway in Jizzakh region
- Units deployed
- 18 units
- Volume delivered
- 620k m³ of soil
- Duration
- 8 months
We organised a continuous flow from the pit to the stockpile and crushing plant. 25 dump trucks ran two shifts with three excavators on loading, all coordinated from the dispatch centre.
We organised a continuous flow from the pit to the stockpile and crushing plant. 25 dump trucks ran two shifts with three excavators on loading, all coordinated from the dispatch centre.
Earthworks + material delivery
Pit excavation + soil removal
Full-cycle quarry service