Quarry haulage + loading
Rock haulage at a quarry in Navoi region
- Units deployed
- 25 units
- Volume delivered
- 1.8M m³ of rock
- Duration
- 14 months
Production-line equipment was moved to a new site using lowbed trailers and truck cranes, with the route agreed and permits obtained in advance.
Production-line equipment was moved to a new site using lowbed trailers and truck cranes, with the route agreed and permits obtained in advance.
Quarry haulage + loading
Earthworks + material delivery
Pit excavation + soil removal